fordman84
Administrator
- Joined
- Aug 13, 2020
- Posts
- 44,128
- Reaction score
- 80,369
- Bookie:
- $ 138,398.00




Because that was the plan after 2011 per the ERCOT response findings. Hot oil dips and winterizing the backup generators was the plan, now we find out that wasn't done.what code?
you have a plant in TX that you don't expect will ever see freezing temperatures. What are you insulating the pipes for?
and even if you are, who's to say the insulation will be enough? We have heat trace in a lot of our lines to make sure the fluid flows in the winter.